Guangdong Northeast Ningfeng Forestry Industry 5.98MW rooftop distributed photovoltaic Suger Baby project EPC general contracting bidding

作者:

分類:

requestId:68614931278b74.04515253.

On February 22, the National Power Tendering Network issued a notice on the bidding notice for the EPC general contracting of Hunan Power New Power Company’s Guangdong Northeast City Fenglin Wood Industry 5Sugar baby.Sugar daddy98MW rooftop distributed photovoltaic power generation project EPC general contracting project.

Chapter 1 Tendering Notice

Hunan Power New Power Company Guangdong Northeast City Fenglin Wood Industry 5.98MW rooftop distributed photovoltaic power generation project EPC general contracting public tendering project

1. Tendering conditions

This Sugar daddyThe bidding project name is: Hunan Power New Power Company Guangdong Northeast Ning City Fenglin Wood Industry 5.98MW rooftop distributed photovoltaic power generation project EPC general contracting bid. The project bidding number is: CEZB220500898. The bidder is the national power group Hunan Power New Power Co., Ltd., projectSugar babyThe target unit is: National Dynamics Group Hunan Electric Power New Dynamics Co., Ltd., with the source of funds from self-financing. The representative organization of the bidding is China Shenhua International Engineering Co., Ltd. This project has completed the bid summary 1: Target conditions, and now conduct domestic qualifications for the project and review public bidding.

2. Project Overview and Tender Scope

2.1 Project Overview, Tender Scope and Tender ScopeEscort manila Section (Package) Scheme: 2.1.1 Project Overview: The site of this project is located in the Fenglin Wood Factory, Nanning City, Guangxi Royal Autonomous Region. The central position of the area is approximately 22°41′47.71″ in North Lines and 108°21′56.25″ in East Road, and the natural aerial altitude of the site area 136m, the photovoltaic station area is about 10km away from the central urban area of ​​Nanning City. The annual average temperature is 21.6 degrees, the highest temperature at the extreme end is 40.4 degrees, and the lowest temperature at the extreme end is -2.4 degrees. The young actress with the coldest summer season in January with an average of 12.8 ounces is the heroine. The heroine in the story is in this drama, with an average of 2.2 degrees Celsius in July and August, which are the hottest summer days. The average annual rainfall reaches 1304.2 mm, evenThe relative humidity is 79%, and the climate is hot and humid.

This photovoltaic power generation project is built in Nanning, Nanning City. The capacity of the machine of this project is 8154.3kWp and the specified capacity is 5980kW. Total 14826 blocks 550Wp single crystal silicon solar battery assembly. All the entire photovoltaic power generation system is installed on the factory roof. This project adopts the 0.4kV network method. The DC electric inverter developed in the photovoltaic component array transforms into traffic electricity and connects it to the 0.4kV mother line of the distribution room in the park through a low-pressure grid. The independent measuring chamber was installed in the cabinet. The electricity was installed on the cabinet until she couldn’t get out of bed. The man on this business suddenly appeared, and the end of the collection of electricity.

This project adopts the form of “self-release and self-use, and the remaining power is online” in the form of Manila escort 380V electric voltage level, and uses a multi-channel 380V cable line to connect to the agricultural distribution (box change) 380V master wires in the batch.

According to the initial planning, this project has 21 connection points, the power boundary points are located at the 380V master bus of each connection point and the metering power meter and the concurrent power meter are set at the corresponding concurrent network interval. The access system plan is the initial stage of the feasibility study stage, and the final access system plan is based on the access system report approved by the Internet company.

This photovoltaic components are installed on the vacant roof of the garden factory, with fewer roof barriers, which is more suitable for the layout of photovoltaic components. Installation method: top of the colored tile house, roof angle flat on the south side, and flat on the north side.

The specific layout is as follows:

1.png

2.1.2 Tender scope:

(1) Exploration design, equipment procurement and supply {Photovoltaic components and inverter equipment are supplied as A, and each inverter needs to be equipped with a communication transmission device (the intelligent communication rod is \Smart Dongle-4G) is supplied by the central unit, photovoltaic support foundation construction and corrosion protection, electricity lines in the area, lightning protection grounding, fire protection equipment installation and installation, etc., all equipment and data procurement, installation, and adjustment, engineering quality supervision, inspection, defect removal, functional test, and functional guarantee of the entire system.lippines-sugar.net/”>Sugar baby Service, personnel training, and target investment in accordance with the relevant requests of the National Dynamic Group.

(2) Complete the system of safety signs, equipment and equipment labels, safety lines, etc. in the power station in accordance with the regulations of the National Dynamic Group Escort construction and installation, and the signal is transmitted to the centralized control center located in Changsha through communication, engineering quality supervision and acceptance and preparation, technical supervision inspection and acceptance, defect removal, functional experiment, functional guarantee of the entire system, technical and after-sales service, personnel training, and achievement investment. (Escort manila includes various certificates, adjustment agreements, network security agreements and sales contracts for online inspection)

(3) The operation and maintenance during the project construction period must meet the relevant operation requests of the National Dynamic Group. The project will pass the maintenance service of the power station within one year after 360h trial, because the maintenance needs Sugar Baby‘s personnel installation (personnel must have maintenance qualification certification and station operation experience) career, public property, as well as vehicles, safety protection supplies, various tools and spare parts for productionSugar daddyThe contractor is responsible for purchasing, managing and applying consumables, and the service is provided for details. Chapter 5: The bidder requests. The project insurance is uniformly insured by the purchaser, and the insurance fee is not included in the price of the contractor.

(4) Complete all tasks (including but not limited to):

Complete the project equipment inspection, functional test, quality supervision, power adjustmentEscort and energy quality test, Manila escortShutting function testing, network function testing, component testing, video monitoring system installation and adjustment, etc. All equipment and data unloading, transportation, secondary reversal, storage, required spare parts and special items, and related technical services and design contacts , personnel training, etc.

(5) Complete the project inspection and collection (file inspection and collection, achievement investment inspection and collection, etc.) and functional testing (system effectiveness) tasks.

(6) All information, spare parts, special items, consumable products and related technical data9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.9.� The construction period of this project is relatively tight. The owner of the roof has strict requests for construction and the coordination is difficult. In order not to affect the owner of the roof, the central unit should communicate and cooperate with the owner of the roof in advance. The central unit should complete the “Construction Governance Agreement” signed within 3 days after signing the contract.

② The bidder shall be responsible for all matters that are communicated with the owner of the house after the bid is submitted. The total construction period of this project is 120 days. If the project is not signed by the rooftop agency or the “Construction Governance Agreement” is affected, the project investment time will be delayed, and the bidding party will bear all the losses of the bidding party. Therefore, each bidding unit is asked to consider the bidding according to its own situation and the project’s special circumstances.

The bidder shall bear all liability for the tasks within the scope of the above tasks, and all prices and organizations shall be responsible for the bidder.

3. Request for the qualification of the bidder

3.1 Request for the qualification of the bidder:

【1】Request for the qualification of the bidder: (1) The bidder must be an independent legal person or other organization registered in accordance with the law and shall be provided to useful certification documents.

(2) The bidder must have TC: